The owners of ZARA and Albo entered into a contract comprising the erection of a steel construction for an entirely new 3 storey building, replacing the existing building on a prime location in downtown Oranjestad, for the sum of AWG 3.348.738,=.
The owners of ZARA and Albo entered into a contract comprising the erection of a steel construction for an entirely new 3 storey building, replacing the existing building on a prime location in downtown Oranjestad, for the sum of AWG 3.348.738,=.