PROJECT SPECIFICATIONS Project: Centro Deportivo Santa Cruz, Winston Ball Park Principal: Fundacion Lotto pa Deporte Design: Hoeverts ArchiDesgn / Archus / HJC (Aruba) Civil Engineer: HJC Engineering Contract sum in US$: 4,254,036 Construction period: April 2009 – April 2010

RENOVATION BOTICA EAGLE

March 6, 2017By flexwebsiteCommercial Buildings
PROJECT SPECIFICATIONS Project: Renovation Botica Eagle Principal: Botica di Servicio Aruba Design: Mastenbroek (Netherlands) Civil Engineer: N/A Contract sum in US$: 227,777 Construction period: August - November 2012

PALM BEACH PLAZA MALL

March 6, 2017By flexwebsiteCommercial Buildings
Full description: This mall in Caribbean style was created in the touristic area at Palm Beach. The construction of the mall consists of steel columns and beams and concrete floors on steel deck. The exterior closed walls are made out of EIFS and the store fronts are full height glass. PROJECT SPECIFICATIONS Project: Palm Beach [...]

PRIVATE RESIDENCE MALMOK

March 6, 2017By flexwebsiteResidences
Full description: This modern dwelling was built using high end finishing materials on a prime location on Aruba. Various materials were used for this prestigious project. In combination with a complex design this created major challenges for Albo’s execution team as each material has its own characteristics. PROJECT SPECIFICATIONS Project: Private Residence Malmok Principal: Private [...]

DWELLING / STUDIO RUMBASTRAAT

March 6, 2017By flexwebsiteResidences
PROJECT SPECIFICATIONS Project: Dwelling / Studio Rumbastraat Principal: JOMI-beheer Design: Archus (Aruba) Civil Engineer: N/A Contract sum in US$: 152,360 Construction period: August 2008 - August 2009

HORACIO ODUBER HOSPITAL

March 6, 2017By flexwebsiteHealthcare
Full description: The extension of Aruba’s Hospital is phase 1 of this major project. During this phase, Albo will erect the new bed tower, a 6-storey building in which rooms for patients will be established. Execution is scheduled from the beginning of 2015 until the end of 2016. In phase 2 (scheduled to start at [...]

QUAY WALL HARBOR BARCADERA

March 6, 2017By flexwebsiteIndustrial Buildings
The renewal and extension of the quay wall at the Barcadera port is part of a comprehensive plan to move Aruba's container terminal from its current location at the Paardenbaai area to Barcadera. This was initiated to start new touristic developments of the former harbor and free zone area, which is in Oranjestad. The Barcadera area is [...]

Restaurant on beach at Bucuti

September 18, 2014By flexwebsiteNews
Completion of new restaurant on beach at Bucuti. In the very short time span of only 10 weeks Albo Aruba NV has demolished the old Pirate’s Nest restaurant on the beach of Bucuti Beach Resort and replaced this with a brand new restaurant and bar, called "the Elements" on a entirely new foundation on the [...]

New container terminal

June 27, 2014By flexwebsiteNews
Albo and AWM sign contracts for the construction of the new container terminal on Aruba. N.V. Arubaanse Wegenbouw Maatschappij and Albo Aruba N.V. have been awarded contracts for the construction of infrastructure and building offices, garage and warehouse for the new container terminal at Barcadera. AWM’s scope consists of the utilities piping, earthwork, paving and [...]

Installing communication antennas

May 16, 2013By flexwebsiteNews
Installing communication antennas at Jamanota Other than construction work Albo Aruba also assists with crane works that have nothing to do with construction. Recently with the help of an Albo crane a communications antenna was installed at the highest point of Aruba. Also other companies are assisted with our cranes; f.i. when the hood of [...]